Bake-Out Procedure for Single Zone Furnaces The furnace contains carefully selected insulation to permit the best possible operation. This insulation inherently contains moisture that must be slowly and completely removed before the furnace can be fully utilized. During this drying period, a small quantity of smoke and vapors from the binders in the embedding cement will also be emitted. The smoke will have a bad odor, so provide adequate ventilation. Please inspect the furnace prior to the bake-out procedure. Please be sure that the furnace core is empty, that nothing is inside of it (ie. no papers, office supplies, tools etc). Please be sure that nothing is on the exterior of the furnace as well. Please follow the recommended procedure to properly dry out the furnace insulation for maximum operating success.
200° C for two (2) hours 400°C for two (2) hours 800°C for one (1) hour 1000°C for one (1) hour After the initial drying out run, the furnace should be run approximately 10°C - 40°C above the normal operating temperature, without exceeding the rated temperature, to fully stabilize the furnace. Under no circumstances should the rated temperature of the furnace be exceeded. WARNING: Due to the possibility of combustible gases being given off by the refractory cement binders as the furnace is heated, Mellen recommends operating the furnace in a tilted or vertical position prevent local hot spots an possible damage to the heating elements or element. Both ends of the bore should be open and the bore empty. After the initial run, the furnace can be operated normally. back to Information Services back to MELLEN home page MELLEN can raise your operating temperature in more ways than one, the hotter the better.
|